High level summary
This week, the hydra team reviewed and addressed several open comments on the new HeadV1 specification, completing a list the of identified gaps between specification and implementation while doing so. In the wake of the recent demonstration of SundaeSwap running their DEX in a Hydra Head, they met with them to capture feature ideas & incorporate their feedback on the roadmap, as well as potential research avenues.
What did the team achieve this week
- Had the monthly review meeting, a bit earlier than expected: https://input-output.atlassian.net/wiki/spaces/HYDRA/pages/3650813953/Monthly+report+-+October+2022
- Reviewed and addressed several open comments on HeadV1 specification.
- Completed the list of identified gaps between specification and implementation #452
- Had two meetings with SundaeSwap to incorporate their feedback (on research and on the roadmap).
- Some small fixes on TUI and our docker images. #538 #562
- Met with the internal audit team and clarified scope.
What are the goals of next week
- Complete the last two items required for a version
0.8.0
. - Cut the next release, version
0.8.0
- Get backup/recovery #187 done with proper event sourcing (ADR18)
- Have the CI build macos artifacts