Skip to main content

Consensus Team Update

· One min read
Damian Nadales

High level summary

  • Onboarded onto the Leios simulator and joined working sessions to provide feedback and ask questions to the research team.
  • Fixed two bugs in the V2 LedgerDB in preparation for LSM tree integration (#1515, #1516).
  • Fixed bugs in db-analyser --store-ledger (#1512).
  • Fixed Ledger CDDL specifications (#5079, #5073, #5066, #5057) as a result of our work on providing CDDLs for Consensus.
  • Started integration work in preparation for the lsm-tree backing, as detailed in #1526.